Project Summary

  • Client: Kementerian Pelajaran Malaysia
  • Implementation: Design & Build
  • Terrain: Hilly
  • Duration: 2008 - 2009
  • Project Cost: 3 Million (MYR)
  • Status: Completed

Project Information

Located in Ampang, Selangor, The failed existing slope was repaired to ensure safety within the school area. The scope of works comprises the design and supervision of infrastructure projects which consists of slope stabilization works (ie. using soil nail and horizontal drain), surface drainage works, etc.
Our extensive resume is comprised of over 50 projects completed