Project Summary

  • Client: EKVE Sdn Bhd
  • Implementation: Design & Build
  • Terrain: Rolling
  • Duration: 2011 - Current
  • Project Cost: 120 Million (MYR)
  • Status: Construction

Project Information

Located in the urban area of Ampang, Selangor, upgrading of the existing road was built on a rolling terrain connecting the existing Kg Pasir junction to Taman Sierra Ukay, Ampang. The project consists of upgrading the existing road to a dual three-lane carriageway for a length of 3.0km and constructing three interchanges and various junctions. The scope of work covers all C&S related design works from conceptual design until design support during construction and supervision.
Our extensive resume is comprised of over 50 projects completed

Our diverse project list includes engineering buildings and manufacturing structures