Projek Menaiktaraf Laluan Persekutuan 12 (FR12) Dari Gambang, Pahang, Ke Segamat, Johor (Fasa 1) (47.0km)

Project Summary

  • Client: Mulia Interlink Construction Sdn Bhd / Jabatan Kerja Raya Malaysia
  • Implementation: Design & Built
  • Terrain: Rolling
  • Duration: 2014 - Current
  • Project Cost: 403 Million(MYR)
  • Status: Construction

Project Information

Located in rural area, an upgrading of existing road to two lane single carriageway road R5d standard was built ona rolling terrain connecting Gambang, Pahang to Segamat, Johor. The project consist of upgrading 47km existing road to two (2) lane single carriageway with an overtaking lane / climbing lane at 5km interval for Phase 1. It also involved upgrading fourteen (14) nos of junctions and three (3) nos of bridges. The scope of work covers all C&S related design works from conceptual design until design support during construction as well as supervision.
Our extensive resume is comprised of over 50 projects completed

Our diverse project list includes engineering buildings and manufacturing structures