Projek Menggantikan Jambatan Sedia Ada Di FT003/624/60 Setiu, Terengganu - Rural

Project Summary

  • Client: Jabatan Kerja Raya Malaysia
  • Implementation: Conventionalt
  • Terrain: Flat
  • Duration: 2013 - 2017
  • Project Cost: 5 Million (MYR)
  • Status: Completed

Project Information

The project is to replace an existing bridge at FT003 in Setiu, Terengganu with a total length of 24m. The bridge is designed as an integral bridge system using T-Beam. The scope of work covers all C&S related design works from conceptual design until design support during construction.